3.4 Designing the operation of an operation monitoring system

The following factors must be examined for the operation of an operation monitoring system that uses Performance Management:

The following explains each of the above factors.

Organization of this section
3.4.1 Examining user management methods
3.4.2 Examining monitoring agent management methods
3.4.3 Examining items to be monitored
3.4.4 Examining the binding method of an alarm table
3.4.5 Examining data management methods
3.4.6 Examining Store database storage methods
3.4.7 Examining measures to take when the operation monitoring system itself malfunctions
3.4.8 Estimating the required hard drive space for Performance Management