6.6 Procedure to perform an overwrite or upgrade installation of JP1/AO (for a Linux cluster system)
In a cluster system, you must perform an overwrite or upgrade installation of JP1/AO on both the active and standby servers.
The overwrite or upgrade installation procedure consists of the following steps.
Task |
Required/ optional |
Reference |
|
---|---|---|---|
1 |
Perform the tasks that must be completed in advance. |
Required |
6.6.1 Tasks that must be completed before an overwrite or upgrade installation (Linux) |
2 |
Configure the services before starting overwrite or upgrade installation. |
Required |
6.6.2 Procedure to configure resources before overwrite or upgrade installation (Linux) |
3 |
Perform an overwrite or upgrade installation of JP1/ AO on the active server. |
Required |
|
4 |
Perform an overwrite or upgrade installation of JP1/ AO on the standby server. |
Required |
|
5 |
change the resource settings |
Required |
|
6 |
If you perform an upgrade installation from a cluster environment built with a JP1/AO version earlier than 11-10, register the resources and to set up the resource group. |
Required |
|
7 |
If you do not use JP1/Base after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later, uninstall JP1/Base. |
optional |
Installation and Setup in the JP1/Base User's Guide |
8 |
In an environment where JP1/AO coexists with JP1/AJS3, if JP1/AO is upgraded from a version earlier than 11-10, perform the following tasks:
|
Required |