6.4.3 Tasks required after an upgrade installation (in an environment in which JP1/AO coexists with JP1/AJS3)
In an environment in which JP1/AO coexists with JP1/AJS3, perform the following tasks after upgrading JP1/AO to 11-10 or a later version:
-
Delete the JP1/AJS3 scheduler service and embedded database.
-
Change or delete execution agents.
-
Change the number of concurrently executable instances of the @SYSTEM execution agent.
-
Delete the loop and userResponse execution agents.
-
-
Uninstall JP1/AJS3 - Manager
If JP1/AJS3 - Manager is not being used, uninstall it.