6.5 Procedure to perform an overwrite or upgrade installation of JP1/AO (for a Windows cluster system)

In a cluster system, you must perform an overwrite or upgrade installation of JP1/AO on both the active and standby servers.

The overwrite or upgrade installation procedure consists of the following steps.

Table 6‒2:  Overwrite or upgrade installation procedure (for a Windows cluster system)

Task

Required/optional

Reference

1

Perform the tasks that must be completed in advance.

Required

6.5.1 Tasks that must be completed before an overwrite or upgrade installation (Windows)

Perform the following operation if you upgrade JP1/AO from version 10 to 12.

6.2.1 Tasks required before an upgrade installation (when upgrading from version 10 to 12)

2

Configure the services before starting overwrite or upgrade installation.

Required

6.5.2 Procedure to configure services before overwrite or upgrade installation (Windows)

3

Perform an overwrite or upgrade installation of JP1/AO on the active server.

Required

6.5.3 Procedure to perform an overwrite or upgrade installation of JP1/AO on the active server(Windows)

4

Perform an overwrite or upgrade installation of JP1/AO on the standby server.

Required

6.5.4 Procedure to perform an overwrite or upgrade installation of JP1/AO on the standby server (Windows)

5

If you perform an upgrade installation from a cluster environment built with a JP1/AO version earlier than 11-10, register the services.

Required

5.3.6 Procedure for using the cluster software to register services (in Windows)

6

Enable failover of the resource group.

Required

6.5.5 Procedure for enabling failover of the resource group (Windows)

7

If you do not use JP1/Base after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later, uninstall JP1/Base.

Optional

Installation and Setup in the JP1/Base User's Guide

8

If you upgrade the version of JP1/AO from 10 to 12, perform post-upgrade tasks.

Required

6.4.1 Tasks required after an upgrade installation (when upgrading from version 10 to 12)

9

If the following case applies, re-create the startup-order definition file of JP1/Base.

In an environment where JP1/AO does not coexist with JP1/AJS3, JP1/Base Control Service is used to start JP1/AJS services after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later.

Optional

6.4.2 Tasks required after an upgrade installation (when automatic startup for JP1/AJS3 is enabled)

Setting the service start and stop sequences in the JP1/Base User's Guide

10

In an environment where JP1/AO coexists with JP1/AJS3, if JP1/AO is upgraded from a version earlier than 11-10, perform the following tasks:

  • Delete the JP1/AJS3 scheduler service and embedded database.

  • Change and delete the execution agents of JP1/AJS3.

  • Uninstall JP1/AJS3 - Manager.

Required

6.4.3 Tasks required after an upgrade installation (in an environment in which JP1/AO coexists with JP1/AJS3)

A.3 Information necessary to perform operations on the scheduler services and embedded databases in a configuration in which JP1/AO coexists with JP1/AJS3

Organization of this section