6.5 Procedure to perform an overwrite or upgrade installation of JP1/AO (for a Windows cluster system)
In a cluster system, you must perform an overwrite or upgrade installation of JP1/AO on both the active and standby servers.
The overwrite or upgrade installation procedure consists of the following steps.
Task |
Required/optional |
Reference |
|
---|---|---|---|
1 |
Perform the tasks that must be completed in advance. |
Required |
6.5.1 Tasks that must be completed before an overwrite or upgrade installation (Windows) Perform the following operation if you upgrade JP1/AO from version 10 to 12. 6.2.1 Tasks required before an upgrade installation (when upgrading from version 10 to 12) |
2 |
Configure the services before starting overwrite or upgrade installation. |
Required |
6.5.2 Procedure to configure services before overwrite or upgrade installation (Windows) |
3 |
Perform an overwrite or upgrade installation of JP1/AO on the active server. |
Required |
|
4 |
Perform an overwrite or upgrade installation of JP1/AO on the standby server. |
Required |
|
5 |
If you perform an upgrade installation from a cluster environment built with a JP1/AO version earlier than 11-10, register the services. |
Required |
5.3.6 Procedure for using the cluster software to register services (in Windows) |
6 |
Enable failover of the resource group. |
Required |
6.5.5 Procedure for enabling failover of the resource group (Windows) |
7 |
If you do not use JP1/Base after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later, uninstall JP1/Base. |
Optional |
Installation and Setup in the JP1/Base User's Guide |
8 |
If you upgrade the version of JP1/AO from 10 to 12, perform post-upgrade tasks. |
Required |
6.4.1 Tasks required after an upgrade installation (when upgrading from version 10 to 12) |
9 |
If the following case applies, re-create the startup-order definition file of JP1/Base. In an environment where JP1/AO does not coexist with JP1/AJS3, JP1/Base Control Service is used to start JP1/AJS services after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later. |
Optional |
6.4.2 Tasks required after an upgrade installation (when automatic startup for JP1/AJS3 is enabled) Setting the service start and stop sequences in the JP1/Base User's Guide |
10 |
In an environment where JP1/AO coexists with JP1/AJS3, if JP1/AO is upgraded from a version earlier than 11-10, perform the following tasks:
|
Required |