Hitachi

JP1 Version 12 JP1/Automatic Operation Configuration Guide 


6.1 Overwrite or upgrade installation procedure

The overwrite or upgrade installation procedure consists of the following steps.

Table 6‒1:  Overwrite or upgrade installation procedure

Task

Required/optional

Reference

1

(If the OS is Windows) To upgrade the JP1/AO version from 10 to 12, perform the pre-installation tasks.

Required

6.2.1 Tasks required before an upgrade installation (when upgrading from version 10 to 12)

2

If the JP1/AO server OS is Linux 8, verify that the ports that JP1/AO will use are not in use.

Required

1.2.3 Check the port to use

3

Perform an overwrite or upgrade installation of JP1/AO.

Required

For non-cluster systems:

6.3 Procedure to perform an overwrite or upgrade installation of JP1/AO (non-cluster system)

For cluster systems:

6.5 Procedure to perform an overwrite or upgrade installation of JP1/AO (for a Windows cluster system)

6.6 Procedure to perform an overwrite or upgrade installation of JP1/AO (for a Linux cluster system)

4

If you do not use JP1/Base after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later, uninstall JP1/Base.

Optional

Installation and Setup in the JP1/Base User's Guide

5

Perform an overwrite installation of JP1/AO Content Pack.

Optional

6.7 Procedure to perform an overwrite installation of JP1/AO Content Pack

6

(If the OS is Windows) To upgrade the JP1/AO version from 10 to 12, perform the post-installation tasks.

Required

6.4.1 Tasks required after an upgrade installation (when upgrading from version 10 to 12)

7

In Windows, if the following case applies, re-create the startup-order definition file of JP1/Base.

In an environment where JP1/AO does not coexist with JP1/AJS3, JP1/Base Control Service is used to start JP1/AJS services after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later.

Optional

6.4.2 Tasks required after an upgrade installation (when automatic startup for JP1/AJS3 is enabled)

Setting the service start and stop sequences in the JP1/Base User's Guide

8

In an environment where JP1/AO coexists with JP1/AJS3, if JP1/AO is upgraded from a version earlier than 11-10, perform the following tasks:

  • Delete the JP1/AJS3 scheduler service and embedded database.

  • Change and delete the execution agents of JP1/AJS3.

  • Uninstall JP1/AJS3 - Manager.

Required

6.4.3 Tasks required after an upgrade installation (in an environment in which JP1/AO coexists with JP1/AJS3)

A.3 Information necessary to perform operations on the scheduler services and embedded databases in a configuration in which JP1/AO coexists with JP1/AJS3