6.1 Overwrite or upgrade installation procedure
The overwrite or upgrade installation procedure consists of the following steps.
Task |
Required/optional |
Reference |
|
---|---|---|---|
1 |
(If the OS is Windows) To upgrade the JP1/AO version from 10 to 12, perform the pre-installation tasks. |
Required |
6.2.1 Tasks required before an upgrade installation (when upgrading from version 10 to 12) |
2 |
If the JP1/AO server OS is Linux 8, verify that the ports that JP1/AO will use are not in use. |
Required |
|
3 |
Perform an overwrite or upgrade installation of JP1/AO. |
Required |
|
4 |
If you do not use JP1/Base after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later, uninstall JP1/Base. |
Optional |
Installation and Setup in the JP1/Base User's Guide |
5 |
Perform an overwrite installation of JP1/AO Content Pack. |
Optional |
6.7 Procedure to perform an overwrite installation of JP1/AO Content Pack |
6 |
(If the OS is Windows) To upgrade the JP1/AO version from 10 to 12, perform the post-installation tasks. |
Required |
6.4.1 Tasks required after an upgrade installation (when upgrading from version 10 to 12) |
7 |
In Windows, if the following case applies, re-create the startup-order definition file of JP1/Base. In an environment where JP1/AO does not coexist with JP1/AJS3, JP1/Base Control Service is used to start JP1/AJS services after upgrading JP1/AO from a version earlier than 11-10 to 11-10 or later. |
Optional |
6.4.2 Tasks required after an upgrade installation (when automatic startup for JP1/AJS3 is enabled) Setting the service start and stop sequences in the JP1/Base User's Guide |
8 |
In an environment where JP1/AO coexists with JP1/AJS3, if JP1/AO is upgraded from a version earlier than 11-10, perform the following tasks:
|
Required |