uCosminexus Service Platform, Basic Development Guide

[Contents][Glossary][Index][Back][Next]

6.6.5 Changing Looping Dependent Targets

When multiple transformation-source nodes are mapped to a single transformation-destination node, you can change the looping dependent targets that were automatically set up for the transformation-source nodes.

To change looping dependent targets:

  1. In the schema tree viewer, right--click the descendant node of the transformation-destination node for which a loop was set up, and click Mapping source.
    The Settings for Mapping Source dialog box opens.
  2. Change Dependent target in Mapping source.
    The path of the changed dependent target becomes an absolute path. For details about how to display path names, see 6.6.6 Displaying the Path of a Transformation-source Node for Which a Looping Dependent Target Is Specified.
  3. Click OK.