Job Management Partner 1/Automatic Job Management System 3 Administration Guide
The following table lists the operation tasks performed during operation of JP1/AJS3. This table also shows the sections in this manual that explain the operation tasks. The operation tasks can be classified into two types: operation tasks related to work tasks, and operation tasks related to system operation.
Table 1-1 Operation tasks performed during operation and the sections that explain the tasks
Operation tasks performed during operation Section in the manual Operation tasks related to work tasks Checking the execution results (normal or abnormal termination) and checking the execution time (startup and termination delays) 5. Monitoring Jobnets Changing the definitions during operation
- Suppressing execution of jobs and jobnets
- Changing a jobnet definition during operation
8. Changing the Settings During Operation Operation tasks related to system operation Backup and recovery (for continuous operation)
- Backing up the setup information of a system that uses JP1/AJS3
- Backing up and restoring databases
- Backing up and restoring jobnets
2. Backup and Recovery
3. Backing Up and Recovering Databases
4. Backing Up and Restoring JobnetsCapacity monitoring
- Monitoring the log file sizes and logged information
- Monitoring the database usage
6. Monitoring Capacities Starting and stopping services 7. Starting and Stopping JP1/AJS3 Services Changing the settings during operation
- Changing the job execution environment (execution agent information)
- Changing a host name and IP address
8. Changing the Settings During Operation Performing tasks for long-term operation (maintenance) 10. Database Maintenance Operation in a cluster configuration (for higher availability) 11. Operation in a Cluster System Operational know-how Providing know-how for JP1/AJS3 operation 9. Operating Methods
Copyright (C) 2009, 2010, Hitachi, Ltd.
Copyright (C) 2009, 2010, Hitachi Solutions, Ltd.