Job Management Partner 1/Performance Management User's Guide

[Contents][Glossary][Index][Back][Next]


5.3.9 Copying a report

To copy the monitoring template or an existing report:

  1. From the monitoring console browser, log on to PFM - Web Console.
    The main window appears.
  2. In the navigation frame of the main window, choose the Reports tab.
    The Reports window appears.
  3. Select a report to be copied in the Reports tree of the navigation frame.
    The selected report is marked with a checkmark.
  4. In the method frame, select the Copy method.
    In the information frame, the Copy window appears, and the Reports tree of the copy destination is displayed.
  5. Select a folder as the copy destination or select User Reports.
  6. Click the OK button.
    The report selected in step 3 is copied to the folder or User Reports selected in step 5.
    Reference note
    If a report with the same name already exists at the copy destination, a report named Copy of report-name is created.

    Figure 5-18 Copy window

    [Figure]

[Contents][Back][Next]


[Trademarks]

All Rights Reserved. Copyright (C) 2009, Hitachi, Ltd.