Job Management Partner 1/Software Distribution Description and Planning Guide

[Contents][Glossary][Index][Back][Next]

5.3 Estimating the hardware requirements

This section describes the CPU performance required in order to run JP1/Software Distribution and the procedure for calculating the required disk and memory space. For the disk space required for the remote control facility, see the manual Job Management Partner 1/Remote Control Description and Operator's Guide.

Organization of this section
5.3.1 CPU performance
5.3.2 Memory requirements
5.3.3 Disk space requirements