15.3.4 Checking the progress of Items

You can check the progress of Items, such as when sent Items were processed and the last node processed.

In the Outbox window, clicking the link under Status for a desired Item in the list displays a dialog box showing the progress of the Item. The following figure shows the dialog box showing the progress of an Item.

Figure 15‒13: Dialog box showing the progress of an Item

[Figure]

This dialog box displays the route of the corresponding Item and log information about the processing of the Item at each node. You can use this dialog box to check the progress of an Item and obtain details about the user that processed the Item. Processed activities are displayed in orange.