2.3.2 Forcibly terminating a job

To terminate a running job forcibly, open the Checking the status dialog box from the Job Design View. You can terminate a job forcibly only when it is in the Executing state.

This procedure assumes that a job is in the Executing state.

Procedure

  1. Start the Job Design View, and then select the Exec. on time tab.

    When you select a job, the [Figure] (Checking the status) button appears.

    [Figure]

  2. Click the [Figure] (Checking the status) button to open the Checking the status dialog box.

  3. In the job list in the Checking the status dialog box, click the Stop button.

    A message dialog box appears for confirmation.

    [Figure]

  4. Click the OK button.

    A message dialog box appears.

  5. Check the information in the message dialog box, and then click the OK button.

    Now the job is terminated forcibly.

    [Figure]

  6. Click the [Figure] (Update) button to update the information displayed in the Checking the status dialog box.

  7. Check the information displayed in the Checking the status dialog box.

    You can confirm that the status is set to Ended abnormally(Cancel), indicating that the job was forcibly terminated.

    [Figure]

If you want to suspend a job or to stop monitoring whether an execution condition of a job executed on event is satisfied, use the cpajobstop command. For details on the cpajobstop command, see the manual for Client Process Automation, which is listed in B.1 Related publications.