Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS4918-I

The number of connections for the process (host: host-name)controlling communication between scheduler services is below the maximum value.

Because the number of connections for the scheduler service inter-communication control process is below the maximum value, execution order control for root jobnets between different scheduler services is now possible.

(S)

Continues processing.