Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS4917-E

The number of times the process (host:host-name) controlling communication between scheduler services has terminated abnormally has exceeded the threshold. Therefore, the process controlling communication between scheduler services has been blocked.

The scheduler service inter-communication control process was blocked because the number of times this process terminated abnormally has exceeded the threshold.

(S)

Blocked the scheduler service inter-communication control process because the threshold was exceeded.

(O)

Memory might be insufficient, or the maximum number of processes that can be started in the system might have been reached.

In UNIX, review the settings of the kernel parameters related to memory and processes, and then re-set the values. For details about the kernel parameters, see 3.2.5 Estimating the values for kernel parameters in the JP1/Automatic Job Management System 3 System Design (Configuration) Guide. For details about how to estimate the size of memory used, see 3.2.3 Estimating the size of memory used in the JP1/Automatic Job Management System 3 System Design (Configuration) Guide.

Check the status of the processes that were running when the error occurred, and make sure that the amount of memory available is greater than the estimated value.

If you cannot determine the cause of the error, collect data and then contact the system administrator (see 1.2.3 To the system administrators).