Nonstop Database, HiRDB Version 9 Installation and Design Guide
For a HiRDB parallel server configuration, operations such as unloading system log files at each server may become complex. In this case, when a HiRDB event is sent to JP1/Base, jobs can be executed automatically by JP1/AJS3 (for JP1 Version 8 or earlier, JP1/AJS2; for JP1 Version 5 or earlier, JP1/Automatic Operation Monitor) using the sent event as the trigger, allowing HiRDB operations to be automated.
The following figure shows the automatic control achieved by JP1 linkage when system log files are unloaded.
Figure 7-8 Automatic control achieved by JP1 linkage when system log files are unloaded
For details about JP1/AJS3, see the JP1 manuals.
All Rights Reserved. Copyright (C) 2012, 2015, Hitachi, Ltd.