OpenTP1 Version 7 System Definition
When a node is added, the following tasks are required:
The following table lists the definitions that must be reviewed when a node is added and indicates under what conditions a review is required.
Table 7-6 Definitions that must be reviewed when a node is added
Definition file name | Definition | Condition under which a review is required |
---|---|---|
betranrc | all_node_extend_number | The definition must be reviewed unconditionally. |
env | static_shmpool_size | The definition must be reviewed unconditionally. |
ist | ist_node | The definition must be reviewed when the IST table is accessed. |
jnl | max_socket_descriptors | The definition must be reviewed when the global archive journal facility is used. |
|
max_socket_descriptors | The definition must be reviewed unconditionally. |
nam | name_cache_size | The definition must be reviewed unconditionally. |
name_total_size | The definition must be reviewed unconditionally. |
All Rights Reserved. Copyright (C) 2006, 2010, Hitachi, Ltd.