10.2 Setup for linking JP1/IM
The following figure shows an example of a system configuration for linking with JP1/IM.
|
To monitor the JP1/AJS3 status with an icon, JP1/IM - Manager is required.
In this example, events issued by JP1/AJS3 - Manager and JP1/AJS3 - Agent are passed through JP1/Base to JP1/IM - Manager. When JP1/IM - View logs in to JP1/IM - Manager, you can display the JP1 events collected in the manager in JP1/IM - View.
To call JP1/AJS3 - View from JP1/IM - View, install JP1/AJS3 - View and JP1/IM - View on the same host.
The following figure shows the setup procedures for linking JP1/IM - Console.
|
To monitor the status of JP1/AJS3 by using icons, execute the ajs_adapter_setup command from the JP1/AJS3 manager host. This operation is required to enable JP1/IM to collect the JP1/AJS3 definition information. Use the following format to execute the ajs_adapter_setup command:
ajs_adapter_setup -i
To stop linkage with JP1/IM, execute ajs_adapter_setup -u command.
- Organization of this section
-
-
10.2.1 Setup for displaying the job that has output the JP1 event in the Jobnet Monitor
-
10.2.2 Setup for displaying Web GUI from the Event Console window of JP1/IM - View
-
10.2.3 Setup for displaying a hyperlink to Web GUI in the Event Details window of JP1/IM - View
-
10.2.4 Setup for displaying a Web GUI URL in emails sent by automated actions of JP1/IM
-