Hitachi

JP1 Version 13 JP1/Automatic Job Management System 3 Messages


KAVV175-E

A date before 1994 cannot be specified.

You attempted to display a date earlier than the year 1994 in the Daily Schedule or Monthly Schedule window.

(S)

Cancels processing.

(O)

In the Daily Schedule or Monthly Schedule window, display a date in the range from the year 1994 to the four-digit year set for the SCHEDULELIMIT environment setting parameter. For details on the SCHEDULELIMIT environment setting parameter, see 20.4.2(123) SCHEDULELIMIT in the JP1/Automatic Job Management System 3 Configuration Guide.