Hitachi

JP1 Version 13 JP1/Automatic Job Management System 3 Messages


KNAK3290-E

The number of operation requests from the management portal to the connection-destination manager has exceeded the maximum number of operations that can be concurrently run.

Operation requests sent from the management portal to the connected manager exceeded the maximum allowable number of concurrent operations.

(S)

Cancels processing.

(O)

Wait a while, and then re-execute the operation.

If this message is frequently displayed, review the estimate of the value set for the MAXOPEEXEC environment setting parameter and revise the setting if necessary. For details about the environment setting parameters, see 20.15 Management Portal execution environment in the JP1/Automatic Job Management System 3 Configuration Guide.