Hitachi

JP1 Version 12 JP1/IT Desktop Management 2 - Asset Console Configuration and Administration Guide


12.6.1 Setting a deadline

You can set a deadline for completing a new Item, based on an interval (number of days) since the Item is sent. This setting is optional. If you set a deadline, an Item whose deadline has passed is displayed in red in the Inbox.

To set a deadline for an Item:

  1. In Flow Designer, from Tools, click the Set Deadline button.

    A dialog box for specifying the deadline in days appears.

    The permitted maximum value is 999 days.

  2. Specify the deadline in days, and then click the OK button.

    The dialog box for specifying the deadline closes and the specified deadline is set.

    For an Item for which a deadline has been set, you can determine the Expiration date in the Inbox and Outbox windows.

To release the set deadline:

In the procedure for setting the deadline, specify 0 or blank as the deadline.