Hitachi

JP1 Version 12 JP1/Performance Management Reference


KAVJS2506-E

An attempt to copy a folder failed because the number of folder levels exceeds the allowed maximum.

Copying a folder to this destination would exceed the maximum number of folder levels.

(O)

Select a node in which the maximum number of folder levels will not be exceeded.