KAVJJ6615-I
A connection to the host-name-of-PFM-Manager-with-which-a-connection-is-currently-established instance of PFM-Manager has been established.
After the IM management node-related information was applied, a role reversal occurred between the primary PFM - Manager and the secondary PFM - Manager at the connection destination.
- (O)
-
Take one of the following measures to ensure that the configuration information of the PFM - Manager with which a connection is currently established is in agreement with the IM management node-related information:
-
Perform a primary-to-secondary or secondary-to-primary switchover of the PFM - Manager with which a connection is currently established.
-
Apply the IM management node-related information to JP1/IM2.
-