Hitachi

JP1 Version 12 JP1/Integrated Management 2 - Manager Messages


KAVB1919-E

No more definitions can be added because the size of the severity change definition has reached the maximum (maximum-size).

No more definitions can be added because the size of the event condition in the severity change definition file has reached the maximum.

S:

Terminates processing.

O:

Delete unnecessary severity change definitions.