Hitachi

JP1 Version 12 JP1/Integrated Management 2 - Manager Messages


KAVB1577-I

A status operation was performed. (user who performed the operation = JP1-user, event ID = event-ID, status before operation = status-before-operation, status after operation = status-after-operation)

The action status operation was performed.

S:

Continues processing.