Hitachi

JP1 Version 12 JP1/Integrated Management 2 - Manager Messages


KAVB1205-E

Timeout occurred in the server processing.

Host name: host-name, Port number: port-number

A time-out occurred during processing at the server side.

S:

Suspends processing.

O:

Carefully review the communication time-out setting. IPv6 addresses cannot be used for connection. If a KAVB1880-E message was output to the integrated trace log of the connected manager host, see the instructions provided in that message.

If you are using the communication encryption function, check its settings for errors.