Hitachi

JP1 Version 12 JP1/Integrated Management 2 - Manager Messages


KAVB0516-E

The number of characters (bytes) in the operands exceeds the maximum (maximum-length).

The attribute value of the specified event condition exceeds the maximum length.

S:

Waits for re-entry of information.

O:

Specify the event condition again, and then retry the operation.