Hitachi

JP1 Version 12 JP1/Integrated Management 2 - Manager Administration Guide


7.2.2 Changing the status of monitoring nodes

This subsection explains how to change the status of a monitoring node displayed in the Visual Monitoring window. The status that can be changed and the action that occurs at the time of the change differ depending on the monitoring node type (monitoring group or monitored object). For details, see 5.2.2 Statuses of monitoring nodes in the JP1/Integrated Management 2 - Manager Overview and System Design Guide.

Changing the status of a monitoring node requires at least JP1_Console_Operator permission. When the monitoring range settings of the monitoring tree are enabled, you can change the status of only those monitoring nodes that can be accessed with at least JP1_Console_Operator permission from among the monitoring nodes being displayed.

To change the status of a monitoring node:

  1. Select a monitoring node.

  2. From the popup menu that opens when you right-click the mouse, choose Change Status and change the status to the desired one.

    A confirmation dialog box opens.

  3. In the configuration dialog box, click Yes.