Hitachi

JP1 Version 12 JP1/Client Process Automation Messages


KNAO0206-E

The planned time of job was calculated out of time that the system can use. (job-name)

The scheduled time of the next run does not fall in an acceptable range for the system.

(S)

Discontinues the processing.

(O)

Change the schedule settings so that the date is 2037-12-31 or earlier and then register the job again.