Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 for Enterprise Applications Description, User's Guide and Reference


KAJM2849-E

Process-chain-end monitoring is canceled because a reconnection timeout occurred. (process chain: process-chain-ID, log: log-ID)

Monitoring is aborted because reconnection was not performed during the specified reconnection retry time.

S:

The system aborts command execution.

O:

Read the messages that are output before this message and the SAP BW system log to determine the cause of the error. Check whether the value of the retry count or the retry time (RetryCount key or RetryTime key in the command section of the environment setup file) is appropriate.

Use the SAP front-end software to check the status of the process chain. Abort execution of the process chain if necessary.