Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 for Enterprise Applications Description, User's Guide and Reference


KAJM1872-W

The maximum number of monitored jobs was exceeded. (maximum number: maximum-number)

When maximum-number is 100, JP1/AJS3 for EAP can monitor the completion of one job that is released from JP1 and 99 child jobs generated during its execution.

S:

The system does not detect any subsequent child jobs. The system continues completion monitoring and returns 1 to indicate that the result of at least one job could not be checked.

O:

Divide jobs or take other measures to ensure that the number of jobs being monitored does not exceed the maximum limit.