KNAK3213-E
For the start date of item-name, specify a date before the end date. (start date = specified-value, end date = specified-value)
A date after the end date is specified for the start date of the item (item-name).
- (S)
-
Cancels processing.
- (O)
-
Change the start date for the item indicated in item-name to a date before the end date.