Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KNAD3976-W

process-name start in the disaster recovery start mode.

Operation was switched to the remote site while the disk copy and mirroring features of the hardware were in use. JP1/AJS3 will restart the process indicated in process-name in disaster recovery mode.

(S)

Starts the process indicated in process-name in disaster recovery mode.

(O)

Complete the procedure to resume operation at the remote site. For details, see 11.2.1 Switching operation to the remote site in the JP1/Automatic Job Management System 3 Administration Guide.