KAVS4914-E
The connection was reset while the process (host:host-name) controlling communication between scheduler services was communicating with the process (host:host-name or IP-address) controlling communication between scheduler services at the communication destination. : maintenance-information
The connection was reset while the scheduler service inter-communication control process was communicating with the scheduler service inter-communication control process at the communication destination. The probable causes are:
-
The JP1/AJS3 service on the destination host has stopped.
-
An error occurred on the scheduler service inter-communication control process at the communication destination.
-
The scheduler service inter-communication control process at the communication destination terminated abnormally.
-
The communication encryption function is disabled on the communication source host and enabled on the communication destination host.
- (S)
-
Terminates communication with the scheduler service inter-communication control process at the communication destination.
- (O)
-
If necessary, check whether the scheduler service inter-communication control process is running on the communication destination host, and whether the communication encryption function is set correctly.
If the communication encryption function is disabled on the communication source host and enabled on the communication destination host, match the settings on both hosts, and then restart the JP1/Base service and JP1/AJS3 service.