Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS4724-E

The number of times the process controlling communication between scheduler services has Reconnection has exceeded the threshold. Therefore,the process controlling communication between scheduler services has been Reconnection processing blocked. (scheduler-service-name)

Reconnection was attempted because disconnection of communication with the scheduler service inter-communication control process was detected, but the connection could not be established before the number of times reconnection was attempted exceeded the threshold. Therefore, the reconnection processing is canceled.

(S)

Continues processing in reduced mode for the execution order control for root jobnets between processing scheduler services. The system abnormally terminates the running jobnet connector for which Other service is specified for Connection range and any connection-destination jobnet whose status is Wait for start time.

Any jobnet connector or connection-destination jobnet for which execution is attempted in reduced mode for the execution order control also terminates abnormally.

(O)

To control the execution order for root jobnets between scheduler services, restart the scheduler service to cancel reduced mode for the execution order control.