Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS4720-E

An attempt to connect to the process controlling communication between scheduler services has failed. (scheduler-service-name) : maintenance-information

An attempt to connect to the scheduler service inter-communication control process has failed.

(S)

If the number of reconnections has not reached the threshold, the system outputs a KAVS4722-I message and then starts reconnection processing. If the reconnection is successful, the system outputs a KAVS4723-I message.

If the number of reconnections has reached the threshold, the system outputs a KAVS4724-E message and sets reduced mode for the execution order control for root jobnets between scheduler services.

(O)

Take action according to the message that was output before or after this error message.