Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS4710-E

Cannot use the controlling execution order of Root jobnet between scheduler services. (scheduler-service-name) : maintenance-information

The jobnet connector or the connection-destination root jobnet cannot be executed. The probable causes are:

(S)

Places the connection-destination jobnet into Ended abnormally status.

(O)

Check the value of the RJCUSE environment setting parameter. For details on the environment setting parameters, see 20.4 Setting up the scheduler service environment in the JP1/Automatic Job Management System 3 Configuration Guide.

If the scheduler service inter-communication control process has stopped, restart the JP1/AJS3 service.