Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Messages


KAVS0942-W

Connection to job status notification process has been reset.

The status report process was disconnected because the status report process stopped during communication with the job-completion wait process.

(S)

Stops the scheduler service.

(O)

If the KAVU6101-I message is output before and after this message, this message is output at the end of the status report process and there is no problem. If the KAVU6101-I message is not output before and after this message, collect the internal trace log and then contact the system administrator.