Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 Administration Guide


5. Monitoring the Operating Status

This chapter describes monitoring of the JP1/AJS3 operating status.

During operation, three important points that need to be focused on in the monitoring of the operating status are as follows:

- Checking whether the information for the number of days specified in the estimate is output to log files.

- Checking the amount of the used area in the database.

- Checking whether JP1/AJS3 is operating without any problems

Determine the procedure and schedule for these tasks, and then perform the tasks periodically.

Organization of this chapter