Hitachi

JP1 Version 12 JP1/Automatic Job Management System 3 System Design (Configuration) Guide


5. Contingency Planning

This chapter discusses the preventive measures required in JP1/AJS3.

JP1/AJS3 requires backups and redundancy as preventive measures. It is vital to plan such measures in advance so that the system can be restored with little impact should an unpredictable event occur.

Organization of this chapter