6.2.3 General procedure for deploying SLM (when linking with a newly deployed Performance Management)
The figure below shows the general procedure for deploying SLM that is linked with a newly deployed Performance Management when an SLM linked with Performance Management is to run in a cluster configuration. Steps 1 through 3 in the figure can be performed in any order; the same applies to steps 5 and 6.
The procedure explained here is applicable to SLM that runs in a cluster configuration. For details about the deployment procedure when the Performance Management to be linked with SLM is also run in a cluster configuration, see the description of configuration and operation in a cluster system in the JP1/Performance Management User's Guide.