Hitachi

JP1 Version 11 JP1/Service Level Management Description


6.1.3 Failover timing

Failover occurs at the following times:

The table below describes the failures that are detected by SLM as resulting in failover. When SLM detects such a failure, it terminates the Windows services and notifies the cluster software of the failure.

Table 6‒3: Failures detected by SLM as resulting in failover

No.

Status

Failure

Description

1

All statuses

Abnormal process termination

An SLM process terminated abnormally.

2

Memory shortage

A memory shortage occurred in SLM.

This results in the same status as 1 above because the corresponding process terminates abnormally.

3

Monitoring of services is underway

Communication error

A communication error occurred while SLM was monitoring services and all retry attempts failed.

This results in the same status as 1 above because the source process terminates abnormally.

4

Database access error#

A database access error occurred while SLM was monitoring services and all retry attempts failed.

This results in the same status as 1 above because the source process terminates abnormally.

#

Not applicable to SLM - UR.

The failures detected by the cluster software depend on cluster software specifications. For details, see the cluster software documentation.