Hitachi

Job Management Partner 1 Version 10 Job Management Partner 1/Automatic Job Management System 3 Messages 2


KNAD3788-E

JP1/AJS3: The number of restarts of management-target-process-name exceeded the specified restart count.

The number of restarts for the process under management has exceeded the setting. management-target-process-name is the name of a process configured from all components under the control of system management.

(S)

Continues processing.

(O)

Check the integrated trace log for data output for the process under management that terminated abnormally, and remove the cause of the problem. Next, use the jajs_spmd_status command to check the command status, and then restart JP1/AJS3.

If this message is still output after the cause of the problem has been removed, a restart might have failed due to too short a retry interval for the managed process. See 7.3.1 Restarting an abnormally terminated JP1/AJS3 process in the Job Management Partner 1/Automatic Job Management System 3 Administration Guide, and then adjust the retry interval. If the managed process has not output a message or if there is no problem with the retry interval, use the data collection tool to collect data, and then contact the system administrator.