Hitachi

Job Management Partner 1 Version 10 Job Management Partner 1/Automatic Job Management System 3 Messages 1


KAVS4907-W

The number of connections for the process (host:host-name) controlling communication between scheduler services has exceeded the maximum value, and therefore the connection could not be made with the connection destination host (host:host-name or IP-address).

The connection could not be established because the number of connections for the scheduler service inter-communication control process has exceeded the maximum.

(S)

Continues processing.

Note that you cannot use the execution order control for root jobnets between processing scheduler services until the number of connections has dropped below the maximum.

Also note that either of the following occurs until a KAVS4918-I message is output.

  • The connection-destination jobnet for which Synchro is specified for Exec. order method is placed into Ended abnormally status.

  • The jobnet connector is placed into Ended abnormally status.

(O)

After the KAVS4918-I message is output, re-execute the jobnet connector or connection-destination jobnet that could not be connected.

In addition, re-estimate the value of the GWMAXCONNECTION environment setting parameter according to 2.2 Setting up the scheduler service environment in the Job Management Partner 1/Automatic Job Management System 3 Configuration Guide 2.