Hitachi

Job Management Partner 1 Version 10 Job Management Partner 1/Automatic Job Management System 3 Messages 1


KAVS4751-W

Since the new generation(execution-ID) is created to change the jobnet definition of the generation(unit-name:execution-ID), information of the temporary change in plan before the definition change is lost.

If an operation that switches a jobnet definition and creates new generations is performed, information about the changes made by using Change Plan before the jobnet definition is switched will be lost.

(S)

Continues processing.

(O)

Use information such as the scheduler log to check the changes made by using Change Plan for the generations before the jobnet definition is switched, and then make these changes again for the new generations after the jobnet definition is switched.

If the release entry or release cancellation switches a jobnet definition, *** appears in execution ID in the message because all generations after the release date are re-created. If necessary, use information such as the schedule log to apply the changes that were made by using Change Plan to the generations that are created after the release date.