KAVS4720-E
An attempt to connect to the process controlling communication between scheduler services has failed. (scheduler-service-name) : maintenance-information
An attempt to connect to the scheduler service inter-communication control process has failed.
- (S)
-
If the number of reconnections has not reached the threshold, the system outputs a KAVS4722-I message and then starts reconnection processing. If the reconnection is successful, the system outputs a KAVS4723-I message.
If the number of reconnections has reached the threshold, the system outputs a KAVS4724-E message and sets reduced mode for the execution order control for root jobnets between scheduler services.
- (O)
-
Take action according to the message that was output before or after this error message.