15.7.5 Change Priority dialog box
The Change Priority dialog box changes the priority of jobnet execution. The following figure shows the Change Priority dialog box.
The following explains the displayed items.
- Jobnet name
-
Displays the name of the jobnet to be changed.
- Priority
-
In the Priority dropdown list, specify the priority of jobnet execution. You can set None, or 1 to 5. The highest priority is 5. The default is the priority preset for the jobnet.