Hitachi

Job Management Partner 1 Version 10 Job Management Partner 1/Automatic Operation Configuration Guide


4.8.1 Procedure to move the time forward on the JP1/AO server

To move the time forward on the JP1/AO server, you must stop and start the product.

In a cluster system, change the time on both the active server and the standby server. For the procedures to start and stop the JP1/AO system, follow the instructions in the Job Management Partner 1/Automatic Operation Administration Guide.

To move the time forward on the JP1/AO server:

  1. In the Tasks window, check the tasks. If any tasks are in the execution status (In Progress, Waiting for Response, Abnormal Detection, or Terminated), stop execution of the tasks or wait until the task status changes to the ended status.

  2. Stop the JP1/AO service.

    For non-cluster systems:

    Execute the hcmdssrv command with the /stop option specified.

    For cluster systems:

    Use the cluster software to bring the service offline.

  3. Stop the JP1/Base service.

  4. Move the time forward on the JP1/AO server.

  5. Start the JP1/AO service.

    For non-cluster systems:

    Execute the hcmdssrv command with the /start option specified.

    For cluster systems:

    Use the cluster software to bring the service online.

Related topics