Hitachi

Job Management Partner 1 Version 10 Job Management Partner 1/IT Service Level Management Description, User's Guide, Reference and Operator's Guide


6.2.4 General procedure for deploying ITSLM (when linking with an existing Performance Management)

The figure below shows the general procedure for deploying ITSLM that is linked with an existing Performance Management when an ITSLM linked with Performance Management is to run in a cluster configuration. Steps 1 through 3 in the figure can be performed in any order; the same applies to steps 5 and 6.

Figure 6‒11: General procedure for deploying ITSLM when ITSLM is linked to an existing Performance Management

[Figure]

The procedure explained here is applicable to ITSLM that is run in a cluster configuration. For details about the deployment procedure when Performance Management to be linked with ITSLM is run in a cluster configuration, see the description of configuration and operation in a cluster system in the Job Management Partner 1/Performance Management User's Guide.