Scalable Database Server, HiRDB Version 8 Installation and Design Guide

[Contents][Index][Back][Next]

7.4.3 Automatic job execution using JP1/AJS2 linkage

In the case of a HiRDB/Parallel Server, operations such as unloading system log files at each server may become complex. If HiRDB events are sent to JP1/Base, you can use JP1/AJS2 to execute jobs automatically on the basis of those events, thereby achieving automation of HiRDB operation.

Figure 7-8 shows automatic control achieved by JP1 linkage when system log files are unloaded.

Figure 7-8 Automatic control achieved by JP1 linkage when system log files are unloaded

[Figure]

For details about JP1/AJS2, see the JP1 manual. Because the manual name depends on the JP1 version, see the correct manual for the version you are using: