Job Management Partner 1/Automatic Job Management System 3 Operator's Guide
This section explains the following items to customize JP1/AJS3 - View window.
- Changing the function menu items to be displayed
- Setting the window refresh interval
- Setting the warning message to be displayed when a jobnet is registered for fixed execution
- Setting the display status of the list area
- Specifying the columns displayed in the list area
- Maintaining the selected units and the scroll position after the window is updated or list filtering is specified
- Displaying the operation menu items other than Register for Execution and Cancel Registration in a pop-up menu
- Adding Add and Changing Plan to the menu bar
- Changing the window that is displayed when a jobnet is double-clicked in the list area
- Preventing users from changing job definitions when the Define Details dialog box is opened from the Monitor Details dialog box
- Enlarging the Execution Result Details dialog box.
- Specifying the first execution time
- Changing the maximum number of units to be monitored
- Organization of this section
- 11.4.1 Changing the function menu items to be displayed
- 11.4.2 Setting the window refresh interval
- 11.4.3 Setting the warning message to be displayed when a jobnet is registered for fixed execution
- 11.4.4 Setting the display status of the list area
- 11.4.5 Specifying the columns displayed in the list area
- 11.4.6 Maintaining the selected units and the scroll position after the window is updated or list filtering is specified
- 11.4.7 Displaying the operation menu items other than Register for Execution and Cancel Registration in a pop-up menu
- 11.4.8 Adding Add and Changing Plan to the menu bar
- 11.4.9 Changing the window that is displayed when a jobnet is double-clicked in the list area
- 11.4.10 Preventing users from changing job definitions when the Define Details dialog box is opened from the Monitor Details dialog box
- 11.4.11 Enlarging the Execution Result Details dialog box
- 11.4.12 Specifying the first execution time
- 11.4.13 Changing the maximum number of units to be monitored
Copyright (C) 2009, 2010, Hitachi, Ltd.
Copyright (C) 2009, 2010, Hitachi Solutions, Ltd.