1.2 Key decisions in the system design stage

The following table lists the key decisions in the system design stage, and the relevant chapters in this manual.

Table 1-1 System design decisions and relevant chapters

No. Key decisions Relevant chapter
1 System configuration, network configuration, job execution environment, and database requirements 2. Designing the System Configuration
2 Estimates:
  • Computer performance
  • System resources
  • Sizes of database area and log files
  • Kernel parameters
3. Estimates
3 Required JP1/AJS3 environment settings (parameters) for building the system 4. Installation and Setup Considerations
4 Contingency measures such as backups and redundancy 5. Contingency Planning
5 Database maintenance 6. Maintenance Planning
6 Use of QUEUE jobs, submit jobs, and queueless jobs 7. Special Modes of Operation
7 Migration and version compatibility 8. Migration from a Previous Version
8 Other matters related to system design 9. Notes on System Design